In 2020, the Elvalhalcor – Halcor Copper tubes division – the largest copper tubes producer in Europe – decided to make minor changes of the layout of copper tube Plant. These changes include the construction of two rooms, one to be used as a welding shop and the other for the installation of new CNC grinding machine.
EPD Engineering Services carried out the project in limited time.
Deliverables & Services
- Survey
- Concert Design
- 3D design Layout
- 3D Visualization
- Electromechanical Studies of the tow rooms
- Lighting Study
- Construction Drawings