In 2020, the Elvalhalcor – Halcor Copper tubes division – the largest copper tubes producer in Europe – decided to make minor changes of the  layout of  copper tube Plant. These changes include the construction of two rooms, one to be used as a welding shop and the other for the installation of new CNC grinding machine.

EPD Engineering Services carried out the project in limited time.

Deliverables & Services

  • Survey
  • Concert Design
  • 3D design Layout
  • 3D Visualization
  • Electromechanical Studies of the tow rooms
  • Lighting Study
  • Construction Drawings